Opportunity ID: 253128

General Information

Document Type: Grants Notice
Funding Opportunity Number: F14AS00132
Funding Opportunity Title: DOI Project # NE011: Muddy Creek Wetland Restoration Project, Chatham, MA — Hurricane Sandy Disaster Relief
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Other (see text field entitled “Explanation of Other Category of Funding Activity” for clarification)
Category Explanation: Hurricane Sandy Disaster Relief, PL 113-2
Expected Number of Awards: 1
Assistance Listings: 15.677 — Hurricane Sandy Disaster Relief Activities-FWS
Cost Sharing or Matching Requirement: No
Version: Synopsis 1
Posted Date: Mar 28, 2014
Last Updated Date:
Original Closing Date for Applications: Apr 28, 2014
Current Closing Date for Applications: Apr 28, 2014
Archive Date: Apr 30, 2014
Estimated Total Program Funding: $3,385,800
Award Ceiling: $3,385,800
Award Floor: $3,385,800

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility:

Additional Information

Agency Name: Fish and Wildlife Service
Description: This is an announcement for issuing a single source financial assistance award to the Massachusetts Department of Fish and Game ¿ Division of Ecological Restoration (MADER). This announcement is for notification purposes only. The intent of the award is to replace existing undersized culverts at a MA Rte. 28 road crossing over Muddy Creek in the towns of Chatham and Harwich, Barnstable County, MA to restore natural tidal flow and estuarine habitats, improve water quality, enhance fish passage, and reduce the flood risk to public and private infrastructure during future storm events. This award is issued to provide financial assistance to collaboratively-developed priority projects in Hurricane Sandy disaster areas that will restore environmental resources and reduce flood hazards through collaborative efforts with local communities. The project is expected to improve flood resiliency, restore ecosystem function, provide fish and wildlife habitat, provide fish passage, reduce potential flood damage, and increase public safety.

Flood resiliency will be obtained by replacing two aging, obsolete stone culverts with a properly sized bridge span, thereby reducing the risk of catastrophic culvert and road failure and the potential for the uncontrolled release of storm surge waters and sediment that would cause damage upstream and downstream of the road crossing. Additionally, greater tidal exchange will improve water quality, enhance fish passage, and restore conditions that will promote the restoration of salt marsh vegetation landward of the tidal restriction. Ecosystem function will be achieved by restoring conditions that will allow a tidal creek system to develop that is in dynamic equilibrium with future changes in coastal hydrology, thereby providing habitat resiliency for potential impacts to fish and wildlife habitats. The Massachusetts Department of Fish and Game – MADER is the recipient of this award due to their unique qualification to complete the project. This project is authorized by the Disaster Relief Appropriations Act of 2013, Public Law 113-2.

Link to Additional Information: http://www.grants.gov
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Arnold Zinan, 413 253 8528
arnold_zinan@fws.gov

Email:arnold_zinan@fws.gov

Version History

Version Modification Description Updated Date

Related Documents

Packages

Agency Contact Information: Arnold Zinan, 413 253 8528
arnold_zinan@fws.gov

Email: arnold_zinan@fws.gov

Who Can Apply: Organization Applicants

Assistance Listing Number Competition ID Competition Title Opportunity Package ID Opening Date Closing Date Actions
15.677 PKG00194504 Mar 28, 2014 Apr 04, 2014 View

Package 1

Mandatory forms

253128 SF424_Mandatory_1_2-1.2.pdf

253128 SF424C_2_0-2.0.pdf

253128 Budget-1.1.pdf

253128 Project-1.0.pdf

253128 Mandatory_SF424D-1.1.pdf

2025-07-09T10:24:54-05:00

Share This Post, Choose Your Platform!

About the Author: