Opportunity ID: 308207
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | BOR-PN-18-N027 |
| Funding Opportunity Title: | South Branch Canal Lining-Phase I |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Grant |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | 1 |
| Assistance Listings: | 15.517 — Fish and Wildlife Coordination Act |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 1 |
| Posted Date: | Aug 14, 2018 |
| Last Updated Date: | – |
| Original Closing Date for Applications: | Aug 28, 2018 |
| Current Closing Date for Applications: | Aug 28, 2018 |
| Archive Date: | Sep 27, 2018 |
| Estimated Total Program Funding: | $5,751,700 |
| Award Ceiling: | $5,751,700 |
| Award Floor: | $1 |
Eligibility
| Eligible Applicants: | Special district governments |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | Bureau of Reclamation |
| Description: |
KRD has successfully used this method to line and conserve water in the NBC, and will use a similar method for SBC to line 13,862 LF of canal to conserve 1585 acre-feet/year for instream flow supplementation. The end project will allow KRD the flexibility to use the conserved water for instream flow, enhance tributary flows, and provide any additional water capacity during periods of drought.
KRD will: · Oversee construction of the project. · Collaborate with federal and state agencies. · Monitor effectiveness of project. · Monitor the project’s milestones to complete the project in a timely matter. · Secure all permits necessary to perform the work, including but not limited to, a water right permit, building permit, and conditional use permit or equivalent. · Excavate the SBC bed to properly prepare the surface to maximize the membrane’s life expectancy and product warranties. · Perform all site preparation work necessary for site access and improvements. · Install concrete overlay to prevent deterioration and damage to lining to ensure 50-year life expectancy. · Line canal walls with a geomembrane liner to prevent water loss. · Install ramps, flumes, trench spoils and other items addressed in the SOW’s anticipated tasks for construction. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
R. Filbert
Grants Management Spec Phone 208-378-5241 Email:rfilbert@usbr.gov |
Version History
| Version | Modification Description | Updated Date |
|---|---|---|