Opportunity ID: 227939

General Information

Document Type:: Grants Notice
Funding Opportunity Number:: R13SS40014
Funding Opportunity Title:: Huntington Cleveland Salinity Reduction Project
Opportunity Category:: Continuation
Opportunity Category Explanation:: CategoryExplanation
Funding Instrument Type::
Category of Funding Activity:: Environment
Category Explanation::
Expected Number of Awards:: 1
Assistance Listings Number(s):: 15.509 — Colorado River Basin Salinity Control Program
Cost Sharing or Matching Requirement:: Yes
Version:: Synopsis 1
Posted Date:: Mar 22, 2013
Last Updated Date::
Original Closing Date for Applications:: Mar 29, 2013
Current Closing Date for Applications:: Mar 29, 2013
Archive Date:: Mar 30, 2013
Estimated Total Program Funding:: $ 1,109,913
Award Ceiling:: $1,109,913
Award Floor:: $1,109,913

Eligibility

Eligible Applicants:: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility::

Additional Information

Agency Name:: Bureau of Reclamation – Upper Colorado Region
Description:: This is a Notice of Intent to Award to Huntington Cleveland Irrigation Company.

Reclamation awarded agreement 04-FC-40-2242 in 2004 to Huntington Cleveland Irrigation Company (HCIC) to replace approximately 350 miles of existing earthen canals and laterals with a pressurized pipeline distribution system in the Northern Emery County in and around the towns of Huntington, Lawrence, Cleveland, and Elmo, Utah. This project, when fully completed, will reduce the salt loading to the Colorado River system by 59,000 tons annually. Due to unforeseen events and weather conditions the duration of the project has extended beyond what was originally envisioned. As a result Reclamation is issuing a follow-on agreement to complete the remaining unfinished work associated with the original agreement 04-FC-40-2242.

Although the project is substantially complete, Reclamation is committed to help fund the approximate last 5% of the project. The anticipated completion date for this project is March 2014. If the project is not completed the anticipated salt load reductions to the Colorado River System will not be realized and the completed portions of the pressurized distribution system will not operate as designed. As a result many individual users in the project area will not have working “on-farm” salinity control measures. HCIC has already completed the designs, engineering, and planning required for the project. In addition, HCIC represents the land owners within the project area, and is the manager and operator of the distribution system, providing it unique access and knowledge of the project areas and requirements necessary for the successful completion of the distribution system.

Link to Additional Information::
Grantor Contact Information:: If you have difficulty accessing the full announcement electronically, please contact:

Version History

Version Modification Description Updated Date
Synopsis 1

Package Status

Below are CLOSED Opportunity Package(s) no longer available for this Funding Opportunity:

Package No: 1

Assistance Listings: 15.509
Competition ID:
Competition Title:
Opportunity Package ID: PKG00171201
Opening Date:
Closing Date: Mar 29, 2013
Agency Contact Information:: Carla Pickering
Who Can Apply:: Organization and Individual Applicants
mendatory_forms Application for Federal Assistance (SF-424) [V2.0]
Budget Information for Construction Programs (SF-424C) [V1.0]
Assurances for Construction Programs (SF-424D) [V1.1]
optional_forms Attachments [V1.1]
Disclosure of Lobbying Activities (SF-LLL) [V1.1]

Packages

Assistance Listings Competition ID Competition Title Opportunity Package ID Opening Date Closing Date Actions Who Can Apply:
15.509 PKG00171201 Mar 29, 2013 View Carla Pickering Organization and Individual Applicants