Opportunity ID: 75393

General Information

Document Type: Grants Notice
Funding Opportunity Number: F11AC00022
Funding Opportunity Title: Construct Waters, a Forage Enhancement and Corral Traps (Bomas) in support of the establishment of a second population of Sonoran Pronghorn
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Natural Resources
Category Explanation:
Expected Number of Awards: 3
Assistance Listings: 15.615 — Cooperative Endangered Species Conservation Fund
Cost Sharing or Matching Requirement: No
Version: Synopsis 1
Posted Date: Mar 01, 2011
Last Updated Date:
Original Closing Date for Applications: Mar 08, 2011
Current Closing Date for Applications: Mar 08, 2011
Archive Date: Apr 07, 2011
Estimated Total Program Funding: $454,000
Award Ceiling: $454,000
Award Floor: $454,000

Eligibility

Eligible Applicants: Others (see text field entitled “Additional Information on Eligibility” for clarification)
Additional Information on Eligibility: This is a single source award for the Arizona Game and Fish Department to design and construct the necessary infrastructure associated with the establishment of an experimental, nonessential Sonoran pronghorn population outside of the species current range but within their historical range in Arizona. This infrastructure will allow us to initiate the process of investigating the process associated with pronghorn reestablishment. Results of this experiment will allow us to begin similar reintroductions elsewhere within their historical range.

The necessary infrastructure includes improvements to an existing well, constructing five waters a forage enhancement plot and up to four corral traps (bomas) in support of the establishment of a second Sonoran pronghorn population. Currently, we are planning to construct a second pen with a total area of one half square mile on the Kofa National Wildlife Refuge. Once the pen is constructed, the infrastructure needs to be in place and operational prior to populating the pen with breeding stock of the experimental pronghorn. The expected outcome is the eventual annual release of the progeny from the pen as the principal means of establishing a second Sonoran pronghorn population.

The establishment of a second population of Sonoran Pronghorn is a necessary action identified in the Sonoran pronghorn recovery plan. The existing pen was built at Cabeza Prieta National Wildlife Refuge in the fall of 2003 in an effort to increase the population size in the U.S. and Mexico as well as providing breeding stock for the establishment of additional populations within the U.S. Since mid 2007, the U.S. Fish and Wildlife Service (Service) in cooperation with the Arizona Game and Fish department, National Park service, Bureau of Land Management, U.S. Air Force, U.S. Army and U.S. Marine Corps have been actively engaged in planning the establishment of a second Sonoran pronghorn population.

Additional Information

Agency Name: Region 2
Description: This is a single source award for the Arizona Game and Fish Department to design and construct the necessary infrastructure associated with the establishment of an experimental, nonessential Sonoran pronghorn population outside of the species current range but within their historical range in Arizona. This infrastructure will allow us to initiate the process of investigating the process associated with pronghorn reestablishment. Results of this experiment will allow us to begin similar reintroductions elsewhere within their historical range.

The necessary infrastructure includes improvements to an existing well, constructing five waters a forage enhancement plot and up to four corral traps (bomas) in support of the establishment of a second Sonoran pronghorn population. Currently, we are planning to construct a second pen with a total area of one half square mile on the Kofa National Wildlife Refuge. Once the pen is constructed, the infrastructure needs to be in place and operational prior to populating the pen with breeding stock of the experimental pronghorn. The expected outcome is the eventual annual release of the progeny from the pen as the principal means of establishing a second Sonoran pronghorn population.

The establishment of a second population of Sonoran Pronghorn is a necessary action identified in the Sonoran pronghorn recovery plan. The existing pen was built at Cabeza Prieta National Wildlife Refuge in the fall of 2003 in an effort to increase the population size in the U.S. and Mexico as well as providing breeding stock for the establishment of additional populations within the U.S. Since mid 2007, the U.S. Fish and Wildlife Service (Service) in cooperation with the Arizona Game and Fish department, National Park service, Bureau of Land Management, U.S. Air Force, U.S. Army and U.S. Marine Corps have been actively engaged in planning the establishment of a second Sonoran pronghorn population.

Link to Additional Information:
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Renee Robichaud

Assistant Refuge Supervisor

Phone 505-248-6480
Email:renee_robichaud@fws.gov

Version History

Version Modification Description Updated Date

Related Documents

Packages

Agency Contact Information: Renee Robichaud
Assistant Refuge Supervisor
Phone 505-248-6480
Email: renee_robichaud@fws.gov
Who Can Apply: Organization Applicants

Assistance Listing Number Competition ID Competition Title Opportunity Package ID Opening Date Closing Date Actions
15.615 PKG00037270 Mar 01, 2011 Mar 08, 2011 View

Package 1

Mandatory forms

75393 SF424-2.0.pdf

Optional forms

75393 SF424D-1.1.pdf

75393 SF424C-1.0.pdf

75393 SF424B-1.1.pdf

75393 SF424A-1.0.pdf

2025-07-12T15:52:17-05:00

Share This Post, Choose Your Platform!

About the Author: