Opportunity ID: 237255
General Information
| Document Type:: | Grants Notice |
| Funding Opportunity Number:: | DE-FOA-0000847 |
| Funding Opportunity Title:: | Marine and Hydrokinetic (Wave) Testing Infrastructure Development |
| Opportunity Category:: | Discretionary |
| Opportunity Category Explanation:: | |
| Funding Instrument Type:: | |
| Category of Funding Activity:: | Energy |
| Category Explanation:: | |
| Expected Number of Awards:: | |
| Assistance Listings Number(s):: | 81.087 — Renewable Energy Research and Development |
| Cost Sharing or Matching Requirement:: | No |
| Version:: | Synopsis 2 |
| Posted Date:: | Jul 05, 2013 |
| Last Updated Date:: | Aug 08, 2013 |
| Original Closing Date for Applications:: | Aug 13, 2013 |
| Current Closing Date for Applications:: | Aug 27, 2013 |
| Archive Date:: | Nov 13, 2013 |
| Estimated Total Program Funding:: | $ 0 |
| Award Ceiling:: | $0 |
| Award Floor:: | $0 |
Eligibility
| Eligible Applicants:: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility:: |
Additional Information
| Agency Name:: | Golden Field Office |
| Description:: | The purpose of this amendment is to:
I. Amend the FOA to extend the application due date by two weeks to now close on 8/27/2013 at 5:00PM Eastern Time. II. All other parts of the Funding Opportunity Announcement remain unchanged. III. All edits are highlighted in yellow to clearly call attention to the revisions that have been made. To potentially support the full-scale testing of MHK wave energy devices, the Water Power Program intends to evaluate site locations, designs, and estimated costs for an open water, fully energetic domestic wave test facility. It is expected that a viable grid-connected facility will be capable of testing both scaled prototypes and full-scale (utility-scale) wave energy conversion devices in order to evolve reliable, low cost, renewable energy alternatives to fossil fuel. Prototype testing is essential to mature existing wave technologies, validate performance against analytic models, demonstrate compliance with applicable design standards and thereby mitigate the technical and financial risk of developing and deploying mass-produced wave energy devices, plants, technologies and related products. Construction and operation of a full-scale domestic wave test facility will assist the U.S. industry by identifying design and manufacturing deficiencies early in the development cyc |
| Link to Additional Information:: | |
| Grantor Contact Information:: | If you have difficulty accessing the full announcement electronically, please contact: |
Version History
| Version | Modification Description | Updated Date |
|---|---|---|
| Synopsis 2 | Aug 08, 2013 | |
| Synopsis 1 |
Package Status
Package No: 1