The Department of Environmental Conservation is offering a grant for the Harper’s Creek Shoreline Stabilization Project focusing on Reach F1. The project aims to design and prepare permits for shoreline stabilization measures, including tree management, offshore rock sills installation, sand placement, and planting of marsh grasses. The design will also incorporate erosion control measures like goose fencing, top soil, seed, and erosion control matting. Applications are open until August 19, 2015, to support efforts in moving the water’s edge away from the bank and promoting a sustainable living shoreline environment.
Opportunity ID: 277818
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | N40080-15-2-0012 |
| Funding Opportunity Title: | Harper’s, Pearson, |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | CategoryExplanation |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Environment |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | 12.300 — Basic and Applied Scientific Research |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 2 |
| Posted Date: | Jul 14, 2015 |
| Last Updated Date: | Aug 04, 2015 |
| Original Closing Date for Applications: | Aug 14, 2015 |
| Current Closing Date for Applications: | Aug 19, 2015 |
| Archive Date: | Sep 13, 2015 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | – |
| Award Floor: | – |
Eligibility
| Eligible Applicants: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | NAVAL FACILITIES ENGINEERING COMMAND |
| Description: | This project will focus on Reach F1 which is 758 linear feet, and faces west-northwest along Harper’s Creek and is bounded by Harper’s Creek to the north and east as well as the NAS PAX Station Weapons Compound to the south and west. The project will design and prepare required permits for shoreline stabilization measures along the length of Reach F1. The design should include felling one 30” diameter breast height (dbh) tree and seven smaller trees (8-12”), trim two trees and clear at least nine dead trees from the bank. The design should provide for the installation of nine off-shore segmented rock sills, each 40 feet long. To move the water’s edge away from the bank and promote a living shoreline, the design should provide for the installation of sand and planting of marsh grasses between the sills and the bank. The design should include goose fencing to protect the young marsh grasses, top soil, seed, and erosion control matting along eroded sections of the bank. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Chelsea Inman
Contract Specialist Phone 202-685-3308 Email:chelsea.inman@navy.mil |
Version History
| Version | Modification Description | Updated Date |
|---|---|---|
| The purpose of this amendment is to:
1. Notify parties preparing proposals that a blank cost template has been added as an attachment to this opportunity announcement. All proposals should be submitted using this template. |
Aug 04, 2015 | |
| Aug 04, 2015 |
DISPLAYING: Synopsis 2
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | N40080-15-2-0012 |
| Funding Opportunity Title: | Harper’s, Pearson, |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | CategoryExplanation |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Environment |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | 12.300 — Basic and Applied Scientific Research |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 2 |
| Posted Date: | Jul 14, 2015 |
| Last Updated Date: | Aug 04, 2015 |
| Original Closing Date for Applications: | Aug 14, 2015 |
| Current Closing Date for Applications: | Aug 19, 2015 |
| Archive Date: | Sep 13, 2015 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | – |
| Award Floor: | – |
Eligibility
| Eligible Applicants: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | NAVAL FACILITIES ENGINEERING COMMAND |
| Description: | This project will focus on Reach F1 which is 758 linear feet, and faces west-northwest along Harper’s Creek and is bounded by Harper’s Creek to the north and east as well as the NAS PAX Station Weapons Compound to the south and west. The project will design and prepare required permits for shoreline stabilization measures along the length of Reach F1. The design should include felling one 30” diameter breast height (dbh) tree and seven smaller trees (8-12”), trim two trees and clear at least nine dead trees from the bank. The design should provide for the installation of nine off-shore segmented rock sills, each 40 feet long. To move the water’s edge away from the bank and promote a living shoreline, the design should provide for the installation of sand and planting of marsh grasses between the sills and the bank. The design should include goose fencing to protect the young marsh grasses, top soil, seed, and erosion control matting along eroded sections of the bank. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Chelsea Inman
Contract Specialist Phone 202-685-3308 Email:chelsea.inman@navy.mil |
DISPLAYING: Synopsis 1
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | N40080-15-2-0012 |
| Funding Opportunity Title: | Harper’s, Pearson, |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | CategoryExplanation |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Environment |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | 12.300 — Basic and Applied Scientific Research |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 1 |
| Posted Date: | Aug 04, 2015 |
| Last Updated Date: | – |
| Original Closing Date for Applications: | – |
| Current Closing Date for Applications: | Aug 14, 2015 |
| Archive Date: | Sep 13, 2015 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | – |
| Award Floor: | – |
Eligibility
| Eligible Applicants: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | NAVAL FACILITIES ENGINEERING COMMAND |
| Description: | This project will focus on Reach F1 which is 758 linear feet, and faces west-northwest along Harper’s Creek and is bounded by Harper’s Creek to the north and east as well as the NAS PAX Station Weapons Compound to the south and west. The project will design and prepare required permits for shoreline stabilization measures along the length of Reach F1. The design should include felling one 30” diameter breast height (dbh) tree and seven smaller trees (8-12”), trim two trees and clear at least nine dead trees from the bank. The design should provide for the installation of nine off-shore segmented rock sills, each 40 feet long. To move the water’s edge away from the bank and promote a living shoreline, the design should provide for the installation of sand and planting of marsh grasses between the sills and the bank. The design should include goose fencing to protect the young marsh grasses, top soil, seed, and erosion control matting along eroded sections of the bank. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Chelsea Inman
Contract Specialist Phone 202-685-3308 Email:chelsea.inman@navy.mil |
Related Documents
Folder 277818 Full Announcement-1 -> sow goose creek f1.pdf
Folder 277818 Full Announcement-1 -> baa for goose creek f1.pdf
Folder 277818 Full Announcement-2 -> pax river cost template harpers pearson goose creek reach f1.pdf
Packages
| Agency Contact Information: | Chelsea Inman Contract Specialist Phone 202-685-3308 Email: chelsea.inman@navy.mil |
| Who Can Apply: | Organization Applicants |
| Assistance Listing Number | Competition ID | Competition Title | Opportunity Package ID | Opening Date | Closing Date | Actions |
|---|---|---|---|---|---|---|
| 12.300 | PKG00217832 | Aug 14, 2015 | View |
Package 1
Mandatory forms
277818 RR_SF424_2_0-2.0.pdf
277818 RR_KeyPersonExpanded_2_0-2.0.pdf
277818 RR_OtherProjectInfo_1_3-1.3.pdf
277818 PerformanceSite_2_0-2.0.pdf
Optional forms
277818 RR_Budget_1_3-1.3.pdf
277818 RR_SubawardBudget_1_3-1.3.pdf