Opportunity ID: 304913

General Information

Document Type: Grants Notice
Funding Opportunity Number: BOR-PN-18-N011
Funding Opportunity Title: Aquatic Invasive Species Prevention on the Flathead Indian Reservation
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Grant
Category of Funding Activity: Natural Resources
Category Explanation:
Expected Number of Awards: 1
Assistance Listings: 15.517 — Fish and Wildlife Coordination Act
Cost Sharing or Matching Requirement: No
Version: Synopsis 1
Posted Date: May 10, 2018
Last Updated Date:
Original Closing Date for Applications: May 24, 2018
Current Closing Date for Applications: May 24, 2018
Archive Date: Jun 23, 2018
Estimated Total Program Funding: $350,000
Award Ceiling: $350,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: This Funding Announcement is not a request for applications. This announcement is to provide public notice of the Bureau of Reclamation’s intention to fund the following project activities without full and open competition.

Additional Information

Agency Name: Bureau of Reclamation
Description:

Supports Department of the Interior’s Safeguarding the West from Invasive Species – Invasive Mussels Initiative

 

The Tribes own and operate the Se’lis Ksanka Qlispe Hydropower Facility (formerly known as Kerr Dam). Inva­sive mussels would affect all submerged components and conduits of that facility, costing the Tribes millions of dollars. If the mussels were to become established here, they would quickly move downstream, invading the entire Columbia system, and the projected cost of controlling them at that point is $500 million annually. And once they become established in a system, they are difficult if not impossible to eradicate. Prevention is the least expensive, most effective course of action, which is why this project – developing a 24-hour AIS check station, prevention through public outreach and education and adding enforcement targeting recreational boaters and anglers – is their focus.

 

Mussel-infested boats are routinely intercepted at inspection stations on their way to the Flathead Basin. Currently we estimate that roughly 30% of watercraft are not stopping at inspection stations because they arrive after the inspection station is closed or because they purposely (and unlawfully) drive-by the station without stopping or are unaware of the legal requirement to stop. This project is needed because of the immediate and grave danger posed by these uninspected boats- it only takes one harboring invasive mussels to infest the entire Flathead Basin, and a single infestation in the Flathead threatens the entire Columbia. The purpose of this project is to help ensure that no mussel­ fouled watercraft arriving via the primary route into the Flathead Basin can launch into basin waters.

Link to Additional Information: www.grants.gov
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Melinda Ritacco

Supervisory Grants Management Specialist

Phone 208-378-5103
Email:mritacco@usbr.gov

Version History

Version Modification Description Updated Date

Related Documents

Packages

2025-07-09T13:36:52-05:00

Share This Post, Choose Your Platform!

About the Author: