Opportunity ID: 355091

General Information

Document Type: Grants Notice
Funding Opportunity Number: W81EWF-24-SOI-0031
Funding Opportunity Title: “Technical Support for Watershed Management and Resilience Plan for Fort Leonard Wood, MO”
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Science and Technology and other Research and Development
Category Explanation:
Expected Number of Awards:
Assistance Listings: 12.630 — Basic, Applied, and Advanced Research in Science and Engineering
Cost Sharing or Matching Requirement: No
Version: Synopsis 1
Posted Date: Jun 24, 2024
Last Updated Date: Jun 24, 2024
Original Closing Date for Applications: Aug 12, 2024
Current Closing Date for Applications: Aug 12, 2024
Archive Date: Dec 31, 2024
Estimated Total Program Funding:
Award Ceiling: $230,000
Award Floor: $0

Eligibility

Eligible Applicants: Others (see text field entitled “Additional Information on Eligibility” for clarification)
Additional Information on Eligibility: This opportunity is restricted to non-federal partners of the Great Rivers Cooperative Ecosystems Studies Unit (CESU).

Additional Information

Agency Name: Dept. of the Army — Corps of Engineers
Description:

The government seeks research and technical support for watershed management modeling and analyses for water quantity and quality, impacts to aquatic species, and effects of extreme rainfall events to take place at the Fort Leonard Wood, MO area. Details of primary tasks are as follows:

Task 1: Watershed modeling

 

SWAT+ modeling will be completed for the Big Piney River (a HUC 12 watershed) and Roubidoux Creek (part of the Upper Gasconade HUC 12 watershed). The area around FLW is a karst landscape. Models will be calibrated using USGS stream gages and TSS sampling data supplied by FLW and ERDC-CERL. Task 1 consists of 2 (two) subtasks. a) Model(s) will incorporate existing climate and watershed/management conditions, b) model(s) will incorporate the recommended areal coverage of BMP types and management practices into the SWAT+ models to estimate change to water quality and discharge under existing climate conditions, Note: ERDC-CERL will assist with creating recommended BMPs and management practices.

 

Task 2: Assess model output and determine management prioritization

 

Interpretation and evaluation of model results to prioritize watersheds to target with proposed BMPs and management. Analyses will include statistical methods to justify periodization. The cost of BMP implementation and ongoing operations and management cost and the potential water quality and quantity impacts will also be included. Standard maintenance plans for all recommended BMPs will be required.

Task 3: Develop a Watershed Management Plan

Develop a Watershed Management Plan with recommended preliminary designs and locations for future development of LID features and BMPs to protect imperiled aquatic species, reduce infrastructure maintenance costs, and support current and future land usages. The final Watershed Management Plan will be included in the FLW Integrated Natural Resources Management Plan (INRMP) and used by land management groups on FLW including the Directorate of Public Works (DPW), Training, Mobilization & Security (DPTMS), and Integrated Training Area Management (ITAM) as well as the adjacent Mark Twain State Forest.

Link to Additional Information:
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Stacy Thurman

Grantor
Email:stacy.d.thurman@usace.army.mil

Version History

Version Modification Description Updated Date

Folder 355091 Full Announcement-FOA -> FOA_W81EWF-24-SOI-0031.pdf

Packages

Agency Contact Information: Stacy Thurman
Grantor
Email: stacy.d.thurman@usace.army.mil
Who Can Apply: Organization Applicants

Assistance Listing Number Competition ID Competition Title Opportunity Package ID Opening Date Closing Date Actions
12.630 PKG00287145 Jun 24, 2024 Aug 12, 2024 View

Package 1

Mandatory forms

355091 RR_SF424_5_0-5.0.pdf

355091 AttachmentForm_1_2-1.2.pdf

355091 SFLLL_2_0-2.0.pdf

355091 RR_KeyPersonExpanded_4_0-4.0.pdf

Optional forms

355091 RR_SubawardBudget_3_0-3.0.pdf

355091 RR_Budget_3_0-3.0.pdf

355091 RR_PersonalData_1_2-1.2.pdf

2025-07-13T02:10:12-05:00

Share This Post, Choose Your Platform!

About the Author: