Opportunity ID: 296593
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | BOR-PN-17-N010 |
| Funding Opportunity Title: | Lewiston Orchard Project (LOP) Water Exchange Project-Well 6 and Power Substation |
| Opportunity Category: | Continuation |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Grant |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | 1 |
| Assistance Listings: | 15.517 — Fish and Wildlife Coordination Act |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 2 |
| Posted Date: | Aug 17, 2017 |
| Last Updated Date: | Sep 15, 2017 |
| Original Closing Date for Applications: | Aug 31, 2017 |
| Current Closing Date for Applications: | Aug 31, 2017 |
| Archive Date: | Sep 30, 2017 |
| Estimated Total Program Funding: | $7,294,352 |
| Award Ceiling: | $7,294,352 |
| Award Floor: | $1 |
Eligibility
| Eligible Applicants: | Special district governments |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | Bureau of Reclamation |
| Description: | Lewiston Orchards Irrigation District (District) is a special government district formed to operate and maintain Reclamation irrigation facilities and distribute natural flow and stored water from Reclamation reservoirs to Lewiston Orchards Project (LOP) lands located in Lewiston, Idaho. The District’s water supply comes from the Craig Mountain watershed. Water is collected during the periods of rain and snow runoff at the three Federally-owned reservoirs operated by the District: The Sweetwater Canal is the primary distribution canal. Water for irrigation is diverted from Sweetwater Creek into this canal and then gravity fed to Reservoir A. Due to threatened steelhead populations covered under the Environmental Species Act (ESA), the District has been greatly restricted on the volume of water it is allowed to divert. The current irrigation system distributes water from the three reservoirs to approximately 3,850 acres within the District’s boundaries, representing 6,240 separate user accounts. Climate changes have created water shortages on and off within the District’s system for the last several years. Also, Reclamation has committed certain stream flows from the Craig Mountain watershed within the Lapawi Basin for the recovery of threatened steelhead populations covered under the ESA. The dwindling water supply is making it very difficult for the District to supply water to its patrons. Past efforts for monitoring of water consumption proved inefficient and often ineffective, and now the District is now trying to balance the water user needs with the emerging needs for water for tribal and environmental uses. In 2005 the District adopted a Water Conservation Plan (plan) that addresses the need for meter irrigation services at each delivery point. The District has actively sought financial assistance from Reclamation to assist in the metering endeavor; by the end of 2015, the District will be approximately 68% metered. In 2013, the District received financial assistance from Reclamation to complete design and construction activities for a pilot groundwater well project to investigate the practicality of the well as a field alternative water supply. Although the hydrology report from the test well has not yet been received, the water supply appears to be promising, so the District is currently being evaluated for more wells, starting with Well #6.To partially resolve impacts in the Lapawi Basin to endangered steelhead and their habitat caused by surface withdrawals of irrigation water, the District has requested financial assistance to complete the engineering design for another proposed groundwater well, Well #6, and to install approximately 2080 irrigation meters at points of water delivery within the distribution system. Additional meters will make the District’s system more efficient and effective. Both of these activities will ultimately create a more stable water supply and allow more surface water from the Craig Mountain watershed to remain in the streams in the Lapawi Basin for threatened steelhead populations covered under the ESA.RECIPIENT INVOLVEMENTThe purpose of this project is to design and construct well #6 and to construct a power station needed to operate the wellfield. Ideally, the second well will be located in close proximity to the pilot well. With this Financial Assistance the District will:•Purchase land and easement sufficient for access and use of the well site and power substation.•Perform all site preparation work necessary for site access and improvements.•Design and construct a power substation necessary to provide ample power to operate the finished wellfield.•Design and construct one well, wellhouse, pump, and piping sufficient to convey groundwater from the deep Lewiston basin aquifer to the existing irrigation distribution system.•Secure all permits necessary to perform the work, including but not limited to, a water right permit, building permit, and conditional use permit or equivalent.•Solicit bids from contractors, negotiate contracts with contractors, and oversee construction of project.•Administer grants, pay contractors, and invoice project supporters.•Work with federal and state agencies to monitor effectiveness of project |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Randall Filbert
Grants Management Spec Phone 208-378-5241 Email:rfilbert@usbr.gov |
Version History
| Version | Modification Description | Updated Date |
|---|---|---|
| Award amount updated. | Sep 15, 2017 | |
| Sep 15, 2017 |
DISPLAYING: Synopsis 2
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | BOR-PN-17-N010 |
| Funding Opportunity Title: | Lewiston Orchard Project (LOP) Water Exchange Project-Well 6 and Power Substation |
| Opportunity Category: | Continuation |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Grant |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | 1 |
| Assistance Listings: | 15.517 — Fish and Wildlife Coordination Act |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 2 |
| Posted Date: | Aug 17, 2017 |
| Last Updated Date: | Sep 15, 2017 |
| Original Closing Date for Applications: | Aug 31, 2017 |
| Current Closing Date for Applications: | Aug 31, 2017 |
| Archive Date: | Sep 30, 2017 |
| Estimated Total Program Funding: | $7,294,352 |
| Award Ceiling: | $7,294,352 |
| Award Floor: | $1 |
Eligibility
| Eligible Applicants: | Special district governments |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | Bureau of Reclamation |
| Description: | Lewiston Orchards Irrigation District (District) is a special government district formed to operate and maintain Reclamation irrigation facilities and distribute natural flow and stored water from Reclamation reservoirs to Lewiston Orchards Project (LOP) lands located in Lewiston, Idaho. The District’s water supply comes from the Craig Mountain watershed. Water is collected during the periods of rain and snow runoff at the three Federally-owned reservoirs operated by the District: The Sweetwater Canal is the primary distribution canal. Water for irrigation is diverted from Sweetwater Creek into this canal and then gravity fed to Reservoir A. Due to threatened steelhead populations covered under the Environmental Species Act (ESA), the District has been greatly restricted on the volume of water it is allowed to divert. The current irrigation system distributes water from the three reservoirs to approximately 3,850 acres within the District’s boundaries, representing 6,240 separate user accounts. Climate changes have created water shortages on and off within the District’s system for the last several years. Also, Reclamation has committed certain stream flows from the Craig Mountain watershed within the Lapawi Basin for the recovery of threatened steelhead populations covered under the ESA. The dwindling water supply is making it very difficult for the District to supply water to its patrons. Past efforts for monitoring of water consumption proved inefficient and often ineffective, and now the District is now trying to balance the water user needs with the emerging needs for water for tribal and environmental uses. In 2005 the District adopted a Water Conservation Plan (plan) that addresses the need for meter irrigation services at each delivery point. The District has actively sought financial assistance from Reclamation to assist in the metering endeavor; by the end of 2015, the District will be approximately 68% metered. In 2013, the District received financial assistance from Reclamation to complete design and construction activities for a pilot groundwater well project to investigate the practicality of the well as a field alternative water supply. Although the hydrology report from the test well has not yet been received, the water supply appears to be promising, so the District is currently being evaluated for more wells, starting with Well #6.To partially resolve impacts in the Lapawi Basin to endangered steelhead and their habitat caused by surface withdrawals of irrigation water, the District has requested financial assistance to complete the engineering design for another proposed groundwater well, Well #6, and to install approximately 2080 irrigation meters at points of water delivery within the distribution system. Additional meters will make the District’s system more efficient and effective. Both of these activities will ultimately create a more stable water supply and allow more surface water from the Craig Mountain watershed to remain in the streams in the Lapawi Basin for threatened steelhead populations covered under the ESA.RECIPIENT INVOLVEMENTThe purpose of this project is to design and construct well #6 and to construct a power station needed to operate the wellfield. Ideally, the second well will be located in close proximity to the pilot well. With this Financial Assistance the District will:•Purchase land and easement sufficient for access and use of the well site and power substation.•Perform all site preparation work necessary for site access and improvements.•Design and construct a power substation necessary to provide ample power to operate the finished wellfield.•Design and construct one well, wellhouse, pump, and piping sufficient to convey groundwater from the deep Lewiston basin aquifer to the existing irrigation distribution system.•Secure all permits necessary to perform the work, including but not limited to, a water right permit, building permit, and conditional use permit or equivalent.•Solicit bids from contractors, negotiate contracts with contractors, and oversee construction of project.•Administer grants, pay contractors, and invoice project supporters.•Work with federal and state agencies to monitor effectiveness of project |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Randall Filbert
Grants Management Spec Phone 208-378-5241 Email:rfilbert@usbr.gov |
DISPLAYING: Synopsis 1
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | BOR-PN-17-N010 |
| Funding Opportunity Title: | Lewiston Orchard Project (LOP) Water Exchange Project-Well 6 and Power Substation |
| Opportunity Category: | Continuation |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Grant |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | 15.517 — Fish and Wildlife Coordination Act |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 1 |
| Posted Date: | Sep 15, 2017 |
| Last Updated Date: | – |
| Original Closing Date for Applications: | – |
| Current Closing Date for Applications: | Aug 31, 2017 |
| Archive Date: | Sep 30, 2017 |
| Estimated Total Program Funding: | $8,999,023 |
| Award Ceiling: | $8,999,023 |
| Award Floor: | $1 |
Eligibility
| Eligible Applicants: | Special district governments |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | Bureau of Reclamation |
| Description: | Lewiston Orchards Irrigation District (District) is a special government district formed to operate and maintain Reclamation irrigation facilities and distribute natural flow and stored water from Reclamation reservoirs to Lewiston Orchards Project (LOP) lands located in Lewiston, Idaho. The District’s water supply comes from the Craig Mountain watershed. Water is collected during the periods of rain and snow runoff at the three Federally-owned reservoirs operated by the District: The Sweetwater Canal is the primary distribution canal. Water for irrigation is diverted from Sweetwater Creek into this canal and then gravity fed to Reservoir A. Due to threatened steelhead populations covered under the Environmental Species Act (ESA), the District has been greatly restricted on the volume of water it is allowed to divert. The current irrigation system distributes water from the three reservoirs to approximately 3,850 acres within the District’s boundaries, representing 6,240 separate user accounts.
Climate changes have created water shortages on and off within the District’s system for the last several years. Also, Reclamation has committed certain stream flows from the Craig Mountain watershed within the Lapawi Basin for the recovery of threatened steelhead populations covered under the ESA. The dwindling water supply is making it very difficult for the District to supply water to its patrons. Past efforts for monitoring of water consumption proved inefficient and often ineffective, and now the District is now trying to balance the water user needs with the emerging needs for water for tribal and environmental uses. In 2005 the District adopted a Water Conservation Plan (plan) that addresses the need for meter irrigation services at each delivery point. The District has actively sought financial assistance from Reclamation to assist in the metering endeavor; by the end of 2015, the District will be approximately 68% metered. In 2013, the District received financial assistance from Reclamation to complete design and construction activities for a pilot groundwater well project to investigate the practicality of the well as a field alternative water supply. Although the hydrology report from the test well has not yet been received, the water supply appears to be promising, so the District is currently being evaluated for more wells, starting with Well #6. To partially resolve impacts in the Lapawi Basin to endangered steelhead and their habitat caused by surface withdrawals of irrigation water, the District has requested financial assistance to complete the engineering design for another proposed groundwater well, Well #6, and to install approximately 2080 irrigation meters at points of water delivery within the distribution system. Additional meters will make the District’s system more efficient and effective. Both of these activities will ultimately create a more stable water supply and allow more surface water from the Craig Mountain watershed to remain in the streams in the Lapawi Basin for threatened steelhead populations covered under the ESA. RECIPIENT INVOLVEMENT The purpose of this project is to design and construct well #6 and to construct a power station needed to operate the wellfield. Ideally, the second well will be located in close proximity to the pilot well. With this Financial Assistance the District will: •Purchase land and easement sufficient for access and use of the well site and power substation. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Randall Filbert
Grants Management Spec Phone 208-378-5241 Email:rfilbert@usbr.gov |