Opportunity ID: 231873
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | N40080-13-LTC-0001 |
| Funding Opportunity Title: | Repair and Retrofit of Holton Pond, NAS Patuxent River, MD |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | 12.300 — Basic and Applied Scientific Research |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 3 |
| Posted Date: | Apr 26, 2013 |
| Last Updated Date: | Apr 30, 2013 |
| Original Closing Date for Applications: | May 03, 2013 |
| Current Closing Date for Applications: | Jun 06, 2013 |
| Archive Date: | Jul 06, 2013 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | $462,000 |
| Award Floor: | $0 |
Eligibility
| Eligible Applicants: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | NAVAL FACILITIES ENGINEERING COMMAND |
| Description: | Holton Pond is located at the intersection of Shaw Road and Tate Road on Naval Air Station Patuxent River (PAXR). It was built during the 1960s and is fed by Sewall and Calvert Ponds. Currently Holton Pond is used primarily for recreational fishing at PAXR. Unfortunately, due to the age of Holton Pond, the original storm drainage pipes are in danger of failing. Failure of these pipes will result in stream flooding, possible sediment release containing harmful residue and potential loss of road access into parts of the Installation.The earthen dam creating Holton Pond is leaking and must be replaced. The sediment dam and the corresponding storm drainage pipes need to be retrofitted before the Pond can be refilled. Holton Pond also needs an additional water level control structure to be considered compliant with Maryland Department of the Environment (MDE) requirements. In 2000, Southern Maryland Resource Conservation and Development Area was contracted to provide the necessary technical studies, design plans and acquire the permits necessary to complete this effort. The original designs were completed in 2006 and submitted to MDE for permitting in 2006. After numerous rounds of consultation with both MDE and the Army Corps of Engineers (ACOE), and the permit was granted on March 26, 2009 allowing this project to move forward. This work will be accomplished per the Navy approved permitted plans currently held at PAXR. The construction will include retrofits for the earthen dam and existing storm drainage pipes as well as construction of a water level control device. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Allison Silver
Contract Specialist Phone 202-685-3162 Email:allison.silver@navy.mil |
Version History
| Version | Modification Description | Updated Date |
|---|---|---|
| Adding CFA number. | Apr 30, 2013 | |
| The full opportunity and the application package will be posted to the synopsis this Wednesday, 01 May 2013. | Apr 30, 2013 | |
| Apr 29, 2013 |
DISPLAYING: Synopsis 3
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | N40080-13-LTC-0001 |
| Funding Opportunity Title: | Repair and Retrofit of Holton Pond, NAS Patuxent River, MD |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | 12.300 — Basic and Applied Scientific Research |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 3 |
| Posted Date: | Apr 26, 2013 |
| Last Updated Date: | Apr 30, 2013 |
| Original Closing Date for Applications: | May 03, 2013 |
| Current Closing Date for Applications: | Jun 06, 2013 |
| Archive Date: | Jul 06, 2013 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | $462,000 |
| Award Floor: | $0 |
Eligibility
| Eligible Applicants: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | NAVAL FACILITIES ENGINEERING COMMAND |
| Description: | Holton Pond is located at the intersection of Shaw Road and Tate Road on Naval Air Station Patuxent River (PAXR). It was built during the 1960s and is fed by Sewall and Calvert Ponds. Currently Holton Pond is used primarily for recreational fishing at PAXR. Unfortunately, due to the age of Holton Pond, the original storm drainage pipes are in danger of failing. Failure of these pipes will result in stream flooding, possible sediment release containing harmful residue and potential loss of road access into parts of the Installation.The earthen dam creating Holton Pond is leaking and must be replaced. The sediment dam and the corresponding storm drainage pipes need to be retrofitted before the Pond can be refilled. Holton Pond also needs an additional water level control structure to be considered compliant with Maryland Department of the Environment (MDE) requirements. In 2000, Southern Maryland Resource Conservation and Development Area was contracted to provide the necessary technical studies, design plans and acquire the permits necessary to complete this effort. The original designs were completed in 2006 and submitted to MDE for permitting in 2006. After numerous rounds of consultation with both MDE and the Army Corps of Engineers (ACOE), and the permit was granted on March 26, 2009 allowing this project to move forward. This work will be accomplished per the Navy approved permitted plans currently held at PAXR. The construction will include retrofits for the earthen dam and existing storm drainage pipes as well as construction of a water level control device. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Allison Silver
Contract Specialist Phone 202-685-3162 Email:allison.silver@navy.mil |
DISPLAYING: Synopsis 2
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | N40080-13-LTC-0001 |
| Funding Opportunity Title: | Repair and Retrofit of Holton Pond, NAS Patuxent River, MD |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | [] |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 2 |
| Posted Date: | Apr 30, 2013 |
| Last Updated Date: | – |
| Original Closing Date for Applications: | – |
| Current Closing Date for Applications: | Jun 06, 2013 |
| Archive Date: | Jul 06, 2013 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | $462,000 |
| Award Floor: | $0 |
Eligibility
| Eligible Applicants: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | NAVAL FACILITIES ENGINEERING COMMAND |
| Description: | Holton Pond is located at the intersection of Shaw Road and Tate Road on Naval Air Station Patuxent River (PAXR). It was built during the 1960s and is fed by Sewall and Calvert Ponds. Currently Holton Pond is used primarily for recreational fishing at PAXR. Unfortunately, due to the age of Holton Pond, the original storm drainage pipes are in danger of failing. Failure of these pipes will result in stream flooding, possible sediment release containing harmful residue and potential loss of road access into parts of the Installation.The earthen dam creating Holton Pond is leaking and must be replaced. The sediment dam and the corresponding storm drainage pipes need to be retrofitted before the Pond can be refilled. Holton Pond also needs an additional water level control structure to be considered compliant with Maryland Department of the Environment (MDE) requirements. In 2000, Southern Maryland Resource Conservation and Development Area was contracted to provide the necessary technical studies, design plans and acquire the permits necessary to complete this effort. The original designs were completed in 2006 and submitted to MDE for permitting in 2006. After numerous rounds of consultation with both MDE and the Army Corps of Engineers (ACOE), and the permit was granted on March 26, 2009 allowing this project to move forward. This work will be accomplished per the Navy approved permitted plans currently held at PAXR. The construction will include retrofits for the earthen dam and existing storm drainage pipes as well as construction of a water level control device. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Allison Silver
Contract Specialist Phone 202-685-3162 Email:allison.silver@navy.mil |
DISPLAYING: Synopsis 1
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | N40080-13-LTC-0001 |
| Funding Opportunity Title: | Repair and Retrofit of Holton Pond, NAS Patuxent River, MD |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Natural Resources |
| Category Explanation: | – |
| Expected Number of Awards: | – |
| Assistance Listings: | [] |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 1 |
| Posted Date: | Apr 29, 2013 |
| Last Updated Date: | – |
| Original Closing Date for Applications: | – |
| Current Closing Date for Applications: | May 03, 2013 |
| Archive Date: | Jun 02, 2013 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | $462,000 |
| Award Floor: | $0 |
Eligibility
| Eligible Applicants: | Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility” |
| Additional Information on Eligibility: | – |
Additional Information
| Agency Name: | NAVAL FACILITIES ENGINEERING COMMAND |
| Description: | Holton Pond is located at the intersection of Shaw Road and Tate Road on Naval Air Station Patuxent River (PAXR). It was built during the 1960s and is fed by Sewall and Calvert Ponds. Currently Holton Pond is used primarily for recreational fishing at PAXR. Unfortunately, due to the age of Holton Pond, the original storm drainage pipes are in danger of failing. Failure of these pipes will result in stream flooding, possible sediment release containing harmful residue and potential loss of road access into parts of the Installation.
The earthen dam creating Holton Pond is leaking and must be replaced. The sediment dam and the corresponding storm drainage pipes need to be retrofitted before the Pond can be refilled. Holton Pond also needs an additional water level control structure to be considered compliant with Maryland Department of the Environment (MDE) requirements. In 2000, Southern Maryland Resource Conservation and Development Area was contracted to provide the necessary technical studies, design plans and acquire the permits necessary to complete this effort. The original designs were completed in 2006 and submitted to MDE for permitting in 2006. After numerous rounds of consultation with both MDE and the Army Corps of Engineers (ACOE), and the permit was granted on March 26, 2009 allowing this project to move forward. This work will be accomplished per the Navy approved permitted plans currently held at PAXR. The construction will include retrofits for the earthen dam and existing storm drainage pipes as well as construction of a water level control device. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Allison Silver
Contract Specialist Phone 202-685-3162 Email:allison.silver@navy.mil |
Related Documents
Packages
| Agency Contact Information: | Allison Silver Contract Specialist Phone 202-685-3162 Email: allison.silver@navy.mil |
| Who Can Apply: | Organization Applicants |
| Assistance Listing Number | Competition ID | Competition Title | Opportunity Package ID | Opening Date | Closing Date | Actions |
|---|---|---|---|---|---|---|
| 12.300 | PKG00175731 | Jun 06, 2013 | View |