Opportunity ID: 334645
General Information
Document Type: | Grants Notice |
Funding Opportunity Number: | N40080-21-2-0005 |
Funding Opportunity Title: | Shoreline Stabilization, NSA Annapolis, MD |
Opportunity Category: | Discretionary |
Opportunity Category Explanation: | – |
Funding Instrument Type: | Cooperative Agreement |
Category of Funding Activity: | Natural Resources |
Category Explanation: | – |
Expected Number of Awards: | 1 |
Assistance Listings: | 12.005 — Conservation and Rehabilitation of Natural Resources on Military Installations |
Cost Sharing or Matching Requirement: | No |
Version: | Synopsis 2 |
Posted Date: | Jul 08, 2021 |
Last Updated Date: | Aug 19, 2021 |
Original Closing Date for Applications: | Aug 24, 2021 |
Current Closing Date for Applications: | Aug 30, 2021 |
Archive Date: | Sep 23, 2021 |
Estimated Total Program Funding: | – |
Award Ceiling: | $358,020 |
Award Floor: | $358,020 |
Eligibility
Eligible Applicants: | Others (see text field entitled “Additional Information on Eligibility” for clarification) |
Additional Information on Eligibility: | Pursuant to Sikes Act Section 670c-1(a), States, local governments, Indian tribes, nongovernmentalorganizations, and individuals are eligible to apply. |
Additional Information
Agency Name: | NAVFAC Washington DC |
Description: |
The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013. |
Link to Additional Information: | – |
Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Olisha G Costa
Grantor Phone 202-685-1257 Email:olisha.g.costa.civ@us.navy.mil |
Version History
Version | Modification Description | Updated Date |
---|---|---|
Amendment 0001:
The purpose of this amendment is to: 1. Extend the proposal due date from 2:00PM EST 24 August 2021 to 2:00 PM EST, 30 August 2021. 2. Provide the Government’s responses to RFIs via the RFI Log dated 8-19-21. 3. Provide the following files in response to RFIs #10 and #30: a. *Archaeology RFI Response Sensitive.pdf *This document will be provided to Offerors via DOD Safe, due to the sensitive nature of the file. 4. Revise Section 1.3 Anticipated Award Date of the BAA, as follows: Announcement Issue Date: 08 July 2021 All other BAA terms and conditions remain unchanged. |
Aug 19, 2021 | |
Jul 08, 2021 |
DISPLAYING: Synopsis 2
General Information
Document Type: | Grants Notice |
Funding Opportunity Number: | N40080-21-2-0005 |
Funding Opportunity Title: | Shoreline Stabilization, NSA Annapolis, MD |
Opportunity Category: | Discretionary |
Opportunity Category Explanation: | – |
Funding Instrument Type: | Cooperative Agreement |
Category of Funding Activity: | Natural Resources |
Category Explanation: | – |
Expected Number of Awards: | 1 |
Assistance Listings: | 12.005 — Conservation and Rehabilitation of Natural Resources on Military Installations |
Cost Sharing or Matching Requirement: | No |
Version: | Synopsis 2 |
Posted Date: | Jul 08, 2021 |
Last Updated Date: | Aug 19, 2021 |
Original Closing Date for Applications: | Aug 24, 2021 |
Current Closing Date for Applications: | Aug 30, 2021 |
Archive Date: | Sep 23, 2021 |
Estimated Total Program Funding: | – |
Award Ceiling: | $358,020 |
Award Floor: | $358,020 |
Eligibility
Eligible Applicants: | Others (see text field entitled “Additional Information on Eligibility” for clarification) |
Additional Information on Eligibility: | Pursuant to Sikes Act Section 670c-1(a), States, local governments, Indian tribes, nongovernmentalorganizations, and individuals are eligible to apply. |
Additional Information
Agency Name: | NAVFAC Washington DC |
Description: |
The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013. |
Link to Additional Information: | – |
Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Olisha G Costa
Grantor Phone 202-685-1257 Email:olisha.g.costa.civ@us.navy.mil |
DISPLAYING: Synopsis 1
General Information
Document Type: | Grants Notice |
Funding Opportunity Number: | N40080-21-2-0005 |
Funding Opportunity Title: | Shoreline Stabilization, NSA Annapolis, MD |
Opportunity Category: | Discretionary |
Opportunity Category Explanation: | – |
Funding Instrument Type: | Cooperative Agreement |
Category of Funding Activity: | Natural Resources |
Category Explanation: | – |
Expected Number of Awards: | 1 |
Assistance Listings: | 12.005 — Conservation and Rehabilitation of Natural Resources on Military Installations |
Cost Sharing or Matching Requirement: | No |
Version: | Synopsis 1 |
Posted Date: | Jul 08, 2021 |
Last Updated Date: | Jul 08, 2021 |
Original Closing Date for Applications: | – |
Current Closing Date for Applications: | Aug 24, 2021 |
Archive Date: | Sep 23, 2021 |
Estimated Total Program Funding: | – |
Award Ceiling: | $358,020 |
Award Floor: | $358,020 |
Eligibility
Eligible Applicants: | Others (see text field entitled “Additional Information on Eligibility” for clarification) |
Additional Information on Eligibility: | Pursuant to Sikes Act Section 670c-1(a), States, local governments, Indian tribes, nongovernmental organizations, and individuals are eligible to apply. |
Additional Information
Agency Name: | NAVFAC Washington DC |
Description: |
The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013. |
Link to Additional Information: | – |
Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Olisha G Costa
Grantor Phone 202-685-1257 Email:olisha.g.costa.civ@us.navy.mil |
Related Documents
Packages
Agency Contact Information: | Olisha G Costa Grantor Phone 202-685-1257 Email: olisha.g.costa.civ@us.navy.mil |
Who Can Apply: | Organization Applicants |
Assistance Listing Number | Competition ID | Competition Title | Opportunity Package ID | Opening Date | Closing Date | Actions |
---|---|---|---|---|---|---|
12.005 | PKG00268116 | Jul 08, 2021 | Aug 30, 2021 | View |