Opportunity ID: 334645

General Information

Document Type: Grants Notice
Funding Opportunity Number: N40080-21-2-0005
Funding Opportunity Title: Shoreline Stabilization, NSA Annapolis, MD
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Natural Resources
Category Explanation:
Expected Number of Awards: 1
Assistance Listings: 12.005 — Conservation and Rehabilitation of Natural Resources on Military Installations
Cost Sharing or Matching Requirement: No
Version: Synopsis 2
Posted Date: Jul 08, 2021
Last Updated Date: Aug 19, 2021
Original Closing Date for Applications: Aug 24, 2021
Current Closing Date for Applications: Aug 30, 2021
Archive Date: Sep 23, 2021
Estimated Total Program Funding:
Award Ceiling: $358,020
Award Floor: $358,020

Eligibility

Eligible Applicants: Others (see text field entitled “Additional Information on Eligibility” for clarification)
Additional Information on Eligibility: Pursuant to Sikes Act Section 670c-1(a), States, local governments, Indian tribes, nongovernmentalorganizations, and individuals are eligible to apply.

Additional Information

Agency Name: NAVFAC Washington DC
Description:

The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis

Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a

walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013.

Link to Additional Information:
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Olisha G Costa

Grantor

Phone 202-685-1257
Email:olisha.g.costa.civ@us.navy.mil

Version History

Version Modification Description Updated Date
Amendment 0001:

The purpose of this amendment is to:

1. Extend the proposal due date from 2:00PM EST 24 August 2021 to 2:00 PM EST, 30 August 2021.

2. Provide the Government’s responses to RFIs via the RFI Log dated 8-19-21.

3. Provide the following files in response to RFIs #10 and #30:

a. *Archaeology RFI Response Sensitive.pdf
b. Site visit sign in sheet.pdf

*This document will be provided to Offerors via DOD Safe, due to the sensitive nature of the file.

4. Revise Section 1.3 Anticipated Award Date of the BAA, as follows:

Announcement Issue Date: 08 July 2021
Application Due Date: 30 August 2021
Estimated Award Date: 30 September 2021

All other BAA terms and conditions remain unchanged.

Aug 19, 2021
Jul 08, 2021

DISPLAYING: Synopsis 2

General Information

Document Type: Grants Notice
Funding Opportunity Number: N40080-21-2-0005
Funding Opportunity Title: Shoreline Stabilization, NSA Annapolis, MD
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Natural Resources
Category Explanation:
Expected Number of Awards: 1
Assistance Listings: 12.005 — Conservation and Rehabilitation of Natural Resources on Military Installations
Cost Sharing or Matching Requirement: No
Version: Synopsis 2
Posted Date: Jul 08, 2021
Last Updated Date: Aug 19, 2021
Original Closing Date for Applications: Aug 24, 2021
Current Closing Date for Applications: Aug 30, 2021
Archive Date: Sep 23, 2021
Estimated Total Program Funding:
Award Ceiling: $358,020
Award Floor: $358,020

Eligibility

Eligible Applicants: Others (see text field entitled “Additional Information on Eligibility” for clarification)
Additional Information on Eligibility: Pursuant to Sikes Act Section 670c-1(a), States, local governments, Indian tribes, nongovernmentalorganizations, and individuals are eligible to apply.

Additional Information

Agency Name: NAVFAC Washington DC
Description:

The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis

Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a

walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013.

Link to Additional Information:
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Olisha G Costa

Grantor

Phone 202-685-1257
Email:olisha.g.costa.civ@us.navy.mil

DISPLAYING: Synopsis 1

General Information

Document Type: Grants Notice
Funding Opportunity Number: N40080-21-2-0005
Funding Opportunity Title: Shoreline Stabilization, NSA Annapolis, MD
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Natural Resources
Category Explanation:
Expected Number of Awards: 1
Assistance Listings: 12.005 — Conservation and Rehabilitation of Natural Resources on Military Installations
Cost Sharing or Matching Requirement: No
Version: Synopsis 1
Posted Date: Jul 08, 2021
Last Updated Date: Jul 08, 2021
Original Closing Date for Applications:
Current Closing Date for Applications: Aug 24, 2021
Archive Date: Sep 23, 2021
Estimated Total Program Funding:
Award Ceiling: $358,020
Award Floor: $358,020

Eligibility

Eligible Applicants: Others (see text field entitled “Additional Information on Eligibility” for clarification)
Additional Information on Eligibility: Pursuant to Sikes Act Section 670c-1(a), States, local governments, Indian tribes, nongovernmental
organizations, and individuals are eligible to apply.

Additional Information

Agency Name: NAVFAC Washington DC
Description:

The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis

Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a

walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013.

Link to Additional Information:
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Olisha G Costa

Grantor

Phone 202-685-1257
Email:olisha.g.costa.civ@us.navy.mil

Folder 334645 Full Announcement-BAA N40080-21-2-0005 -> Attachment D-Appendix E- RevisedGPJDdeliverable_part1.pdf

Folder 334645 Full Announcement-BAA N40080-21-2-0005 -> BAA N40080-21-2-0005 Shoreline Annapolis.pdf

Folder 334645 Full Announcement-BAA N40080-21-2-0005 -> Attachment A-SOW FY21 Annapolis_Carr Creek Shoreline dated 21 Jun 2021.pdf

Folder 334645 Full Announcement-BAA N40080-21-2-0005 -> Attachment E-RFI_Log.pdf

Folder 334645 Full Announcement-BAA N40080-21-2-0005 -> Attachment F -Past Performance N400802120005.pdf

Folder 334645 Revised Full Announcement-Amendment 0001 -> BAA N40080-21-2-0005_Amendment 0001 Shoreline Annapolis.pdf

Folder 334645 Revised Full Announcement-Amendment 0001 -> RFI_Log dated 8-19-21.pdf

Folder 334645 Revised Full Announcement-Amendment 0001 -> Site visit Sign-in Sheet.pdf

Packages

Agency Contact Information: Olisha G Costa
Grantor
Phone 202-685-1257
Email: olisha.g.costa.civ@us.navy.mil
Who Can Apply: Organization Applicants

Assistance Listing Number Competition ID Competition Title Opportunity Package ID Opening Date Closing Date Actions
12.005 PKG00268116 Jul 08, 2021 Aug 30, 2021 View

Package 1

Mandatory forms

334645 SF424_4_0-4.0.pdf

334645 SF424A-1.0.pdf

334645 BudgetNarrativeAttachments_1_2-1.2.pdf