Opportunity ID: 343696

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 11
Posted Date: Sep 21, 2022
Last Updated Date: Mar 13, 2024
Original Closing Date for Applications: Nov 28, 2022
Current Closing Date for Applications: Mar 20, 2024
Archive Date: Apr 19, 2024
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.

Modification 000007 is to make various administrative updates and include the requirement of Impacted Tribal Documentation that was inadvertently deleted in previous amendment. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

Version History

Version Modification Description Updated Date
Modification 000007 is to make various administrative updates and include the requirement of Impacted Tribal Documentation that was inadvertently deleted in previous amendment. Please see full FOA document for a detailed list of the changes. Mar 13, 2024
Modification 000006 is to extend the Round 3 closing date and make various administrative updates, and updates to various terms. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 000005 is to authorize Round 3 and make various administrative updates, and updates to various terms. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 000005 is to authorize Round 3 and make various administrative updates, and updates to various terms. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 000004 is to extend the closing, include the time for the closing, updates to various terms, and add the Energy Data eXchange (EDX) requirements, and clarify language in various sections. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 000003 is to add a second closing, add Phase II CarbonSAFE as Area of Interest 4 and associated requirements, revise prerequisite requirements to Phase IV, reduce page numbers for Technical Volume and CarbonSAFE Phases III, III.5, and IV Project Readiness, update Program Policy Factors, update various terms in different sections, and clarify language in various sections. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 000003 is to add a second closing, add Phase II CarbonSAFE as Area of Interest 4 and associated requirements, revise prerequisite requirements to Phase IV, reduce page numbers for Technical Volume and CarbonSAFE Phases III, III.5, and IV Project Readiness, update Program Policy Factors, update various terms in different sections, and clarify language in various sections. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 0002 is to clarify language in Section VIII, embed the Technical Volume cover page template, and correct the font size for the Summary for Public Release. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 0001 is to extend the application due date, add note regarding second closing date, provide clarification on technical volume page limit, provide clarification on Phase III.5 (AOI2), update program policy factors, provide additional FOA clarifications, and incorporate the Real Property and Equipment term. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Modification 0001 is to extend the application due date, add note regarding second closing date, provide clarification on technical volume page limit, provide clarification on Phase III.5 (AOI2), update program policy factors, provide additional FOA clarifications, and incorporate the Real Property and Equipment term. Please see full FOA document for a detailed list of the changes. Sep 21, 2022
Sep 21, 2022

DISPLAYING: Synopsis 11

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 11
Posted Date: Sep 21, 2022
Last Updated Date: Mar 13, 2024
Original Closing Date for Applications: Nov 28, 2022
Current Closing Date for Applications: Mar 20, 2024
Archive Date: Apr 19, 2024
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.

Modification 000007 is to make various administrative updates and include the requirement of Impacted Tribal Documentation that was inadvertently deleted in previous amendment. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 10

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 10
Posted Date: Sep 21, 2022
Last Updated Date: Feb 15, 2024
Original Closing Date for Applications:
Current Closing Date for Applications: Mar 20, 2024
Archive Date: Apr 19, 2024
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.

Modification 000006 is to extend the Round 3 closing date and make various administrative updates, and updates to various terms. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 9

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 9
Posted Date: Sep 21, 2022
Last Updated Date: Dec 13, 2023
Original Closing Date for Applications:
Current Closing Date for Applications: Feb 20, 2024
Archive Date: Mar 21, 2024
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description:

This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.Modification 000005 is to authorize Round 3 and make various administrative updates, and updates to various terms. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530

carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 8

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 8
Posted Date: Sep 21, 2022
Last Updated Date: Dec 13, 2023
Original Closing Date for Applications:
Current Closing Date for Applications: Feb 20, 2024
Archive Date: Mar 21, 2024
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.

Modification 000005 is to authorize Round 3 and make various administrative updates, and updates to various terms. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 7

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Infrastructure Investment and Jobs Act (IIJA)
Opportunity Zone Benefits
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 7
Posted Date: Sep 21, 2022
Last Updated Date: Jul 10, 2023
Original Closing Date for Applications:
Current Closing Date for Applications: Jul 20, 2023 The closing date was extended by 2 weeks from 7/6/2023 to 7/20/2023.
Archive Date: Aug 05, 2023
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description:

This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016. Modification 000004 is to extend the closing, include the time for the closing, updates to various terms, and add the Energy Data eXchange (EDX) requirements, and clarify language in various sections. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530

carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 6

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: No
Version: Synopsis 6
Posted Date: Sep 21, 2022
Last Updated Date: May 16, 2023
Original Closing Date for Applications:
Current Closing Date for Applications: Jul 06, 2023
Archive Date: Aug 05, 2023
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description:

This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.Modification 000003 is to add a second closing, add Phase II CarbonSAFE as Area of Interest 4 and associated requirements, revise prerequisite requirements to Phase IV, reduce page numbers for Technical Volume and CarbonSAFE Phases III, III.5, and IV Project Readiness, update Program Policy Factors, update various terms in different sections, and clarify language in various sections. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530

carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 5

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: No
Version: Synopsis 5
Posted Date: Sep 21, 2022
Last Updated Date: May 16, 2023
Original Closing Date for Applications:
Current Closing Date for Applications: Jul 06, 2023
Archive Date: Aug 05, 2023
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.

Modification 000003 is to add a second closing, add Phase II CarbonSAFE as Area of Interest 4 and associated requirements, revise prerequisite requirements to Phase IV, reduce page numbers for Technical Volume and CarbonSAFE Phases III, III.5, and IV Project Readiness, update Program Policy Factors, update various terms in different sections, and clarify language in various sections. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 4

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 4
Posted Date: Sep 21, 2022
Last Updated Date: Nov 22, 2022
Original Closing Date for Applications:
Current Closing Date for Applications: Nov 30, 2022
Archive Date: Dec 30, 2022
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.

Modification 0002 is to clarify language in Section VIII, embed the Technical Volume cover page template, and correct the font size for the Summary for Public Release. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 3

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 3
Posted Date: Sep 21, 2022
Last Updated Date: Nov 10, 2022
Original Closing Date for Applications:
Current Closing Date for Applications: Nov 30, 2022
Archive Date: Dec 30, 2022
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description:

This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.Modification 0001 is to extend the application due date, add note regarding second closing date, provide clarification on technical volume page limit, provide clarification on Phase III.5 (AOI2), update program policy factors, provide additional FOA clarifications, and incorporate the Real Property and Equipment term. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530

carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 2

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 2
Posted Date: Sep 21, 2022
Last Updated Date: Nov 10, 2022
Original Closing Date for Applications:
Current Closing Date for Applications: Nov 30, 2022
Archive Date: Dec 30, 2022
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.

Modification 0001 is to extend the application due date, add note regarding second closing date, provide clarification on technical volume page limit, provide clarification on Phase III.5 (AOI2), update program policy factors, provide additional FOA clarifications, and incorporate the Real Property and Equipment term. Please see full FOA document for a detailed list of the changes.

Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

DISPLAYING: Synopsis 1

General Information

Document Type: Grants Notice
Funding Opportunity Number: DE-FOA-0002711
Funding Opportunity Title: Bipartisan Infrastructure Law (BIL): Storage, Validation and Testing (Section 40305): Carbon Storage Assurance Facility Enterprise (CarbonSAFE): Phases III, III.5, and IV
Opportunity Category: Discretionary
Opportunity Category Explanation:
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards: 70
Assistance Listings: 81.089 — Fossil Energy Research and Development
Cost Sharing or Matching Requirement: Yes
Version: Synopsis 1
Posted Date: Sep 21, 2022
Last Updated Date: Sep 21, 2022
Original Closing Date for Applications:
Current Closing Date for Applications: Nov 28, 2022
Archive Date: Dec 28, 2022
Estimated Total Program Funding: $2,250,000,000
Award Ceiling: $195,000,000
Award Floor: $1

Eligibility

Eligible Applicants: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled “Additional Information on Eligibility”
Additional Information on Eligibility: See Section III – Eligibility Information of the FOA

Additional Information

Agency Name: National Energy Technology Laboratory
Description: This Funding Opportunity Announcement (DE-FOA-0002711) will support the availability of Carbon Capture, Utilization, and Storage (CCUS) and carbon dioxide removal (CDR) to reach climate goals by building upon these learnings to test, mature, and validate CCUS technologies at commercial-scale. One aspect is the need to improve practices regarding how to efficiently and cost-effectively characterize and permit commercial carbon storage project site(s) ensuring that secure geologic carbon storage is available in diverse regions and settings that will support longer term carbon management goals across the US. The CarbonSAFE initiative was launched in 2016.
Link to Additional Information: FedConnect
Grantor Contact Information: If you have difficulty accessing the full announcement electronically, please contact:

Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email:carla.winaught@netl.doe.gov

Folder 343696 Revised Full Announcement-DE-FOA-0002711 (000003) -> FundOpp_DE-FOA-0002711_Amd_000003.pdf

Folder 343696 Revised Full Announcement-DE-FOA-0002711 (000005) -> FundOpp_DE-FOA-0002711_Amd_000005.pdf

Folder 343696 Revised Full Announcement-DE-FOA-0002711 (000006) -> FundOpp_DE-FOA-0002711_Amd_000006.pdf

Folder 343696 Revised Full Announcement-DE-FOA-0002711 (000007) -> FundOpp_DE-FOA-0002711_Amd_000007.pdf

Packages

Agency Contact Information: Carla J. Winaught 304-285-4530
carla.winaught@netl.doe.gov
Email: carla.winaught@netl.doe.gov
Who Can Apply: Organization Applicants

Assistance Listing Number Competition ID Competition Title Opportunity Package ID Opening Date Closing Date Actions
81.089 PKG00276971 Sep 21, 2022 Mar 20, 2024 View

Package 1

Mandatory forms

343696 SF424_4_0-4.0.pdf

343696 OtherNarrativeAttachments_1_2-1.2.pdf

343696 PerformanceSite_4_0-4.0.pdf

343696 SF424A-1.0.pdf

Optional forms

343696 SFLLL_2_0-2.0.pdf

2025-07-13T17:48:46-05:00

Share This Post, Choose Your Platform!

About the Author: