This grant is for expanding an existing maximum precipitation study at Libby and Bonneville Dams in the Columbia River Basin. Its purpose is to conduct advanced hydrological modeling, including uncertainty and climate change analysis, to project extreme precipitation impacts on these critical structures. The work encompasses new model runs, a comparative review of the current draft report, and integrating climate data. Recipients are required to address external reviewer comments for finalization and publication of research papers and a comprehensive report. This initiative aims to provide vital data for improved water resource management and infrastructure resilience.
Opportunity ID: 339895
General Information
| Document Type: | Grants Notice |
| Funding Opportunity Number: | W81EWF-22-SOI-0006 |
| Funding Opportunity Title: | Libby and Bonneville Dams Maximum Precipitation Studies |
| Opportunity Category: | Discretionary |
| Opportunity Category Explanation: | – |
| Funding Instrument Type: | Cooperative Agreement |
| Category of Funding Activity: | Science and Technology and other Research and Development |
| Category Explanation: | – |
| Expected Number of Awards: | 1 |
| Assistance Listings: | 12.630 — Basic, Applied, and Advanced Research in Science and Engineering |
| Cost Sharing or Matching Requirement: | No |
| Version: | Synopsis 1 |
| Posted Date: | Apr 28, 2022 |
| Last Updated Date: | Apr 28, 2022 |
| Original Closing Date for Applications: | Jun 17, 2022 |
| Current Closing Date for Applications: | Jun 17, 2022 |
| Archive Date: | Jul 17, 2022 |
| Estimated Total Program Funding: | – |
| Award Ceiling: | $80,000 |
| Award Floor: | $0 |
Eligibility
| Eligible Applicants: | Others (see text field entitled “Additional Information on Eligibility” for clarification) |
| Additional Information on Eligibility: | This opportunity is restricted to non-federal partners of the Californian Cooperative Ecosystems Studies Unit (CESU). |
Additional Information
| Agency Name: | Engineer Research and Development Center |
| Description: |
In this study, we are looking to expand an existing maximum precipitation study for Libby and Bonneville Dams in the Columbia River Basin. This work includes model runs, uncertainty analysis and/or climate change analysis along with a comparative review of the current draft report. The recipient will be required to address any external reviewer comments for finalization and publication of papers and a final report. |
| Link to Additional Information: | – |
| Grantor Contact Information: | If you have difficulty accessing the full announcement electronically, please contact:
Kisha Craig
Grants Specialist Phone 6016345397 Email:kisha.m.craig@usace.army.mil |
Version History
| Version | Modification Description | Updated Date |
|---|---|---|
Related Documents
Folder 339895 Full Announcement-FOA -> FOA – SOI CESU Project (FY22)_Duren.pdf
Packages
| Agency Contact Information: | Kisha Craig Grants Specialist Phone 6016345397 Email: kisha.m.craig@usace.army.mil |
| Who Can Apply: | Organization Applicants |
| Assistance Listing Number | Competition ID | Competition Title | Opportunity Package ID | Opening Date | Closing Date | Actions |
|---|---|---|---|---|---|---|
| 12.630 | PKG00273743 | Apr 28, 2022 | Jun 17, 2022 | View |
Package 1
Mandatory forms
339895 RR_SF424_5_0-5.0.pdf
339895 AttachmentForm_1_2-1.2.pdf
Optional forms
339895 RR_SubawardBudget_3_0-3.0.pdf
339895 RR_Budget_3_0-3.0.pdf
339895 RR_PersonalData_1_2-1.2.pdf
339895 SFLLL_2_0-2.0.pdf
339895 RR_KeyPersonExpanded_4_0-4.0.pdf